tuktu

$335,280.96
Sold Out

TOOK-tu

This townhome is composed of four 1,490sf units with three bedrooms and three bathrooms. An optional 740sf basement suite can be also be developed. Savick pricing is to design and prefabricate the projects above grade structure. Please contact us for site specific services such as delivery and installation across Canada and Western US.

Add To Quote

TOOK-tu

This townhome is composed of four 1,490sf units with three bedrooms and three bathrooms. An optional 740sf basement suite can be also be developed. Savick pricing is to design and prefabricate the projects above grade structure. Please contact us for site specific services such as delivery and installation across Canada and Western US.

TOOK-tu

This townhome is composed of four 1,490sf units with three bedrooms and three bathrooms. An optional 740sf basement suite can be also be developed. Savick pricing is to design and prefabricate the projects above grade structure. Please contact us for site specific services such as delivery and installation across Canada and Western US.

Plans Only

  • Floorplan(s)

  • Elevations

  • Construction details (Engineered)

  • Foundation structure (Engineered)

  • Roof structure (Engineered)

  • Wall framing plans (Engineered)

  • Window & door schedule

  • 12 hours of design time for plan customization

  • Specification of finishes & equipment

  • Site plan(s)

  • Site specific energy model (if required)

  • Geotechnical report (if required)

Panel Package

  • Building plans (see above)

  • Chopped straw insulated exterior and party walls

  • Chopped straw insulated roof panels and overframe roof panels

  • Interior walls and floor panels (uninsulated)

  • Stairs and glue laminated wood ridge beam

  • Weather resistant barrier and associated tapes & sealants

  • Furring strips to facilitate installation of interior & exterior finishes

  • Delivery to site (contact Savick for pricing)

  • Panel installation (contact Savick for pricing)

  • Windows & doors

  • Interior & exterior finishes, systems, & equipment

  • Foundation, site work, or services

  • Permitting & development fees

Lead Time

Lead times will vary based on complexity and status of a project. For projects of this nature typically recommend our customers budget 8-12 months from initiating the Savick design process to when the panels are ready for delivery.

Ordering

It is recommended to speak with a Savick Designer prior to ordering your panel package. They are able to offer project specific advice and answer any questions you may have.

tuktu (TOOK-tu) is the Inuktitut term used to describe caribou.